Fluke MET/CAL Procedure ============================================================================= INSTRUMENT: Sub HP 545xx (1 Yr) DC Calibrator /8842 DATE: 08-Sep-98 AUTHOR: Fluke REVISION: $Revision: 1.2 $ ADJUSTMENT THRESHOLD: 70% NUMBER OF TESTS: 2 NUMBER OF LINES: 54 CONFIGURATION: Fluke 8842A ============================================================================= # # Source: # Hewlett Packard publication 54542-97045 # # Compatibility: # MET/CAL 5.1 or later # # Subprocedures: # Sub Wait for Operation Complete (OPC) IEEE # # Required Files: # HP545XX6.BMP # # System Specifications: # TUR calculation is based on specification interval of the accuracy file. # The default 8842A accuracy file contains 90 day specs. # STEP FSC RANGE NOMINAL TOLERANCE MOD1 MOD2 3 4 CON 1.001 RSLT = 1.002 HEAD {DC CALIBRATOR TEST} 1.003 TARGET 1.004 IEEE [GTL] 1.005 PIC HP545XX6 1.006 DISP On the front of the Scope, press the Utility Button. 1.006 DISP 1.006 DISP Next, Press the soft key adjacent to the "Service Menu". 1.006 DISP 1.006 DISP Next, Press the soft key adjacent to "cal select" until 1.006 DISP "1 DC CAL BNC verify" is highlighted on the screen. 1.007 DISP Next, Press the soft key adjacent to "dac output" to 1.007 DISP select "0 volt". 1.008 8842 0.000V N 2W 1.009 MATH M[3] = MEM 1.010 DISP Next, Press the soft key adjacent to "dac output" to 1.010 DISP select "5 volt". 1.011 8842 5.000V N 2W 1.012 MATH MEM = MEM - M[3] 1.013 MEMC 5.000V 0.010U 2.001 DISP Remove the test leads # Clear the Menus 2.002 IEEE :MENU SHOW 2.003 CALL Sub Wait for Operation Complete (OPC) IEEE 2.004 END